60 failures between Sumas (Abbotsford) and Burnaby's Burrard Inlet
Page 39 of 40 and the next page too for TMPL route without a hint of a timeline
![]() |
Let us count the ways |
Internal Corrosion
3rd Party Damage
System Operations
Construction Threat
Total Failure
Environmental Consequence Score
Environment Risk Score
Number of HCAs aka High Consequence Areas
********************
Pipeline Integrity Analyses for Construction in Mountainous Area
********************
.....Therefore, the main public impact consequence that is associated with a catastrophic failure of a high-pressure non-sour gas transmission pipeline is that of thermal radiation subsequent to the ignition of the gas cloud that is evolved from the rupture. .....
GTS-RateCase2015_Exh_ ORA_20150223_ExhORA
![]() |
Page 7 of 27 |
Body Bag Counting before Seismic School Upgrading
![]() |
Page 12 of 27 |